We STREAMLINE your Inventory

Common Tasks:

  • Develop optimized inventory strategy in alignment with production demand and sales forecast 

  • Reduce raw material, component, work in progress and finished goods inventory to reduce working capital and storage footprint 

  • Deploy consignment stock strategy to reduce inventory risk and exposure (vendor owned inventory) 

  • Develop inventory from "Just-in-Case" to "Just-in-Time"

Methods and Tools:

  • DOH Assessment

  • ABC Analysis

  • VED Classification

  • Economic Order Quantity (EOQ)

  • GOLF Classification

  • SIOP Evaluation

Reference Industries:

  • Parts and Components

  • Pharmaceuticals

  • Automotive

  • Food

  • Consumer Goods

  • Building Materials

Ø Project Duration:

Ø Project Payback:

6 - 12 weeks​

5 - 8 months

bottom line optimization 15 - 25%

Reference Project: Physical Inventory Reduction

Industry:

Company Size:

Project Location:

Global Automotive Supplier

135,000+

Germany / Austria / Czech Republic

Problem Statement:

Due to significant space constraints at their Austrian plant, our customer was forced to find creative ways to increase their plant production footprint for expected growth. A plant expansion at this location was not feasible and a 3PL solution not wanted by the executive team. If no solution was developed, the plant would be at risk to miss out on lucrative business in the future.

STREAMLINERS' Approach and Solution

Meeting:

High level understanding of operational core processes; plant and warehouse tour

Deep Dive:

Reveal and map space consuming processes, prioritization by impact; develop conceptual design of optimized layouts with additional production space

Hypothesis:

25% of the Austrian plant is used for finished goods storage and 90% of the finished goods are shipped to sister plants in Germany and the Czech Republic for assembly. Developing and implementing a Just-in-Sequence delivery concept between the Austrian plant and its sister plants in Germany and the Czech Republic will eliminate the finished goods inventory in Austria. The freed up space then can be used for growth in production.  

Project:

2 consultants

12 weeks

Deliverables:

JIS concept developed and implemented

New processes aligned between all 3 plants

Feasibility successfully tested during 2 weeks pilot phase

Inventory reduction road map including schedule 

Bottom Line Impact:

Finished goods physical inventory reduction by ~90%

Production capacity increase by 15-25%

Inventory Reduction (Ramp-up)

Graphics_Inventory Reduction.png

Fees vs. Bottom Line Impact

Graphics_Inventory Reduction_Impact.png